Cycle time in mining refers to the total elapsed time required to complete one full operational cycle of a piece of mining equipment or a defined production process. In open-pit mining operations producing bauxite, gold, iron ore, and alluvial or kimberlite diamonds, haul truck cycle time is one of the most critical productivity metrics, encompassing the time from loading at the dig unit through haulage to the dump point, dumping, and returning empty to the excavator or loader. Haul truck cycle time directly determines the number of cycles achievable per shift and, combined with payload, the productive tonnes moved per hour. Cycle time components typically include spot time, load time, loaded travel time, dump time, empty travel time, and queue times at each activity. Fleet management systems (FMS) such as Wenco, Dispatch, or Modular capture real-time cycle time data for all production equipment, enabling dispatchers and mine planners to identify inefficiencies, optimize truck assignments, and improve equipment utilization. In processing plants, cycle time may refer to the residence time of material within specific unit operations such as leach tanks, ball mills, or dense media separation circuits. Reducing unnecessary cycle time components through improved scheduling, road maintenance, fleet sizing, and dispatch optimization directly translates to improved productivity and lower unit mining costs.